Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Cangzhou Huayang Steel Co

Clamp compression sound test pipe Spiral sound test pipe Grouting steel pipe

sell
  • There is no classification
contact
  • Contact:孙经理
  • Phone:18633723279
  • fax:0317-3517010
search
 
link
  • There is no link yet
home > sell > Zhenjiang acoustic tube, Hangzhou acoustic tube
Zhenjiang acoustic tube, Hangzhou acoustic tube
products: Views:9Zhenjiang acoustic tube, Hangzhou acoustic tube 
brand: 华洋
price: 6.00元/米
MOQ: 1 米
Total supply: 10000000 米
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-05-18 10:18
 
Details
Zhenjiang Acoustic Detection Pipe Hangzhou Acoustic Detection Pipe
How to install the acoustic detection pipe: Pass the wire through the lifting ring on the acoustic detection pipe and tie it to the steel cage. Do not tie it too tightly so that the acoustic detection pipe can rock up and down. . The installation method of acoustic tubes in the second, third and top section of the steel cage is as follows: Place acoustic tubes of different lengths in steel cages of different lengths (the length of the acoustic tube corresponds to the length of the steel cage ). Features of pipe insertion: easy operation, excellent sealing, strong tensile strength, torque resistance, vibration resistance, no leakage, no deformation, and no pipe blockage.
2. Installation and use method: Installation of the bottom section of the steel cage acoustic detection tube: Place the tube (bottom tube with plug) on the ground to check whether the sealing ring is intact, then insert the tube into the tube until it reaches the bottom of the tube. Just tighten the screw. After being connected, put the acoustic detection tube into the steel cage and fasten it to the main bars of the steel cage according to the specified size. For parts without a steel cage, the acoustic detection tube can be fixed or reinforced with steel brackets. The bundling distance of the three main steel bars shall not exceed two meters.
Installation of the second steel cage, the third steel cage and the top steel cage acoustic tube: Place acoustic tubes of different lengths in steel cages of different lengths (the length of the acoustic tube and corresponding to the length of the steel cage). Install by inserting the tube into the tube and pay attention to the integrity of the sealing ring. Then use iron wire to pass through the lifting ring on the acoustic tube to hang the installed acoustic tube on the steel cage. Do not make it too tight and it can move up and down.
Request for quotation
A total of0articles  Related Comments: