*. Grouting pipe/Guangzhou grouting pipe in stock
. 1. The key construction process of grouting pipe installation: table mold processing, installation of a grouting pipe, processing of a spring steel frame, mesh binding of a grouting pipe and Installation of pre-embedded reserved side formwork, installation of one process, acceptance of concrete pouring, concrete raising of 10,000 m3 data thickness. In order to ensure the integrity of the table formwork, the steel plate seam welds should be uniform.
.
.. When each table mold is in place, lay the steam probe etc. at the bottom of the table mold, and adjust the template after installation. The formed steel bars on both sides should be installed according to actual needs and placed in wells with markings.
.
. .When the diameter of the grouting connecting steel bar is less than or equal to , the diameter of the connecting steel bar is greater than or equal to .
.
. .Cut the spring skeleton grouting pipe according to the components. The cutting surface must be smooth and free of burrs. The length of the flat section must be connected with steel bars. During the bending process of the grouting pipe, the inner diameter of the grouting pipe must not be small, cracks and other phenomena may occur.
.
. 2. Spring steel bars The skeleton grouting pipe is fastened to the steel frame and the bamboo frame with steel bars according to the components. After being tied into a jingle, it is stacked at the specified position and needs to be lifted to the platform. The steel bar binding process should be carried out strictly according to the ship support, and the quality wall should be controlled and the finished product should be protected
. The top of the grouting symbol is buried in the template for positioning,
.
32*2.5 grouting pipe/Guangzhou grouting pipe in stock